Precision Brass CNC Turned Parts for Small-to-Medium Batch Production

Process: Precision CNC Lathe & Swiss-Type Turning

Material: Premium Brass C36000 / H59

Feature: Internal Thread & D-Cut Flange

Tolerance: ±0.01mm (Consistent Quality)

Production Batch: 50 - 2,000+ pcs

Standard Lead Time: 7-14 Days for Batches

Fiwok specializes in high-efficiency small-to-medium batch brass CNC turning. We offer cost-effective C36000 brass components with guaranteed tolerances of ±0.01mm. Ideal for SMEs seeking stable supply, fast lead times, and expert engineering support for orders of 10-1000+ pieces.

Precision Brass CNC Turned Parts for Small-to-Medium Batch Production

Precision small batch brass CNC turned parts with D-cut flange and internal threads by Fiwok

Scalable Small-to-Medium Batch Brass Machining

Fiwok specializes in high-efficiency brass CNC turning. We bridge the gap between initial prototyping and massive production, providing consistent ±0.01mm tolerances for batches of 10 to 2,000+ pieces.

  • Cost-Effective: Competitive pricing for small-to-medium runs.
  • Swiss-Type Precision: Perfect for complex D-cut flanges and threads.
  • Fast Lead Times: Production batches ready in 5-14 days.

Technical Specifications

Machining Process Precision CNC Swiss Turning & Automatic Lathe
Material Grade Brass C36000, H59, Lead-Free Brass Options
Tolerance Range ±0.01mm (Dimensional), Ra 0.4 - 0.8 (Surface)
Key Features Internal Threads, D-Cut Flanges, Stepped Shafts

Fiwok Advantage for Batch Production

Repeatable Quality Achieve identical precision across the entire 100-piece or 2,000-piece run with our automated bar feeders.
Agile Supply Chain Direct factory integration ensures zero communication lag and flexible production scheduling.

Target Applications

Our small-batch brass components are widely used in Robotics, Industrial Automation, Electronic Enclosures, and Fluid Control Systems where high conductivity and mechanical reliability are required.

Machining FAQ

Q: What is the typical lead time for a 500-piece brass order?
A: Most production batches are completed within 7-14 business days, depending on secondary finishing requirements.

Q: Can Fiwok handle complex geometries like D-cut flanges?
A: Yes. Our Swiss-type CNC lathes allow us to machine complex D-shapes and internal threads in a single setup, ensuring perfect concentricity.

Mail consultation
Please feel free to give your inquiry in the form below.